Posts Tagged ‘design-build bridging’

New Construction Delivery Methods – Public-Private Partnerships (P3)

Wednesday, March 5th, 2014

In my last two posts, I described the new design-build and design-build bridging construction delivery methods authorized by the General Assembly during the 2013 legislative session.  This post completes our discussion of the new delivery methods by outlining the third method authorized in S.L. 2013-401/H857 – public-private partnerships (P3).

New Design-Build Bridging Construction Method – Design-Build “Lite”

Thursday, February 6th, 2014

My last post discussed the new design-build construction method authorized by the General Assembly during the 2013 Session.  S.L. 2013-401/H857 created not only a design-build construction contracting process, but also a construction contracting process called design-build bridging.  Enacted as G.S. 143-128.1B, design-build bridging might be thought of as design-build “lite,” meaning it is a somewhat […]